On January 31th 2009 we completed two projects very critical to our business. |
|
| August of 2007 after our last increase in bandwidth we started searching for our next | |
| bandwidth upgrade. Because of our location bandwidth is very hard to come by if you want | |
| anything greater than T1 or bonded T1 speeds and don't want to patch things together with | |
| Duck Tape. We had out grown the good ol' T1 and the next logical step was DS3 | |
| services and/or Fiber optics. After many months of negotiations we were able to reach an | |
| agreement with Global Crossing to provide us with DS3 services over fiber. On January | |
| 26th 2009, 24 pair fiber was run to our office and an OC3 was installed in our communications room. This fiber optic upgrade has | |
| paved the way so future upgrades become less expensive and much faster to install. | |
| At present we are a multi-homed ISP with high capacity links to both Global Crossing and Cogent. In preparation to become | |
| multi-homed we needed to give back our old AT&T addresses in favor of a direct allocation of our own IP addresses from ARIN. | |
| This direct allocation of address space means we no longer depend on other service providers and we are considered to be an | |
| autonomous system (AS) on the Internet. For our customers this means we have become a recognized entity on the Internet and our | |
| IP address will never need to change because we have been given the sole right to this IP address space. | |
| One problem we had with upgrading to fiber was where to put it. We were out of wall and rack space in our little 10 X 10 | |
| room so we needed to do something. We found some nice and inexpensive equipment racks and a raised floor. Without changing | |
| building structures we converted our office into a modern Information Center and completely replaced our backup power solution. | |
| Now our 10 X 10 room is referred to as the communications room and the 20 X 15 room next to it is the server room that | |
| houses all our routers, switches and servers. We installed a 10kVA backup battery that will run the Information Center for | |
| about 4 hours and we have a 20kW generator on site. All of our equipment is connected to both battery power and direct | |
| grid power either with dual power supplies or transfer switches. This means that a failure in either power source will not cause | |
| system downtime. | |